Page 15 - TYCONS - ANNUAL REPORT 2022
P. 15

Tycoons Worldwide Group (Thailand) Plc.



                         Billets, after being straightened, are loaded to be desalted by a shot blast, and transferred
                        towards a fluorescent magnetic powder flow detector to be inspected and marked for
                        defective parts on all four surfaces.


                     2)  Billet grinding:
                        Defects on surface of billets are removed by wheel grinding. Complete grinding produces
                        a  high-quality  surface  suitable  for  cold  heading,  cold  forging,  cold  drawing,  cold
                        stranding, and other intensive processing works using billets as raw material.

                     3)  Reheating furnace:
                        Billets are charged into a reheating furnace to heat to the temperature required for rolling.

                     4) Rolling line:
                       Billet is discharged to the mill stand; the mill stand includes roughing mills, intermediate
                        mills, and finishing mill totaling 18 rolling stands. After being rolled, the product is passed
                        through bar reel in order to reel the product bar into coils. With the ventilation system,
                        bar coils are force draft cooled to produce a finished product called “bar in coil”

                     5) Convolution conveyor:
                          After finishing, the product is continuously rolled by 10 rolling stands of finishing block,
                        a “loop layer” shapes the straight line product into circular convolutions, after which it is
                        moved to a convolution conveyor, producing “wire rod coil”.

                     Annealed wire

                     1)   Intermediate drawing: Wire rod is transformed into smaller wire. TYCN has 13 drawing
                         machines for small size and 10 drawing machines for big size.

                     2)  Spheroidized annealed: Wire from step 1  will  be annealed through the spheroidized
                         annealed machines. Currently, TYCN has 11 bases machines.

                      3)   Pickling & coating: Wire will be surface cleaned using one operating line and coated
                         with the rust proof solution as well as lubricants using one of 2 operating lines.

                     4)    Skin pass: In the final stage, wires will pass through the skin pass drawing process.
                          TYCN currently has 24 skin pass machines.

                     Screws & Bolt

                     1)  Heading and threading: Wire will be delivered to the forming plant, passing through the
                         heading and threading machines.

                     2)   Case hardens: After the forming process, screws are treated by carburization to improve
                         their mechanical strength.